UPS
d Workstations at the rate of 65sft. per Workstation.
d A total number of 900 Workstations per Floor.

Two 125A Tap Off Boxes with Metering on each Rising Main
d for small Power main & redundant supply.

Centralised or Floor Wise Location of UPS possible.


d
COMMON SERVICES


Common area lighting, Car Parking lighting, lifts, Water, &
d Fire Fighting Pumps, ETP, STP ect. are covered.

Sufficient Capacitors for Power Factor Compensation for the
d Reactive Loads Provided. Any extra compensation required
d at each floor is not covered.

d
EB SUPPLY


EB Supply will be 33KV Incoming Supply from TNEB through
d a Ring Main unit agreement & further distributed in each
d building via a 11KV Transformer for good voltage regulation.

The total connected load Envisaged Approximately 8700KVA.

Active Load Approximately 6501KVA

a LIGHTING

Design Connected Lighting Load of 80 KW per Floor. Design Lighting
d Level - 300 LUX

One Number Rising Main for Lighting in Each Wing &
d One as Redundant.

Two 63A Tap Off Boxes with Metering on Each Rising Main for
d Lighting Main and redundant supply.

All Internal Office Cabling, Switches not included. Distribution from
d Rising Main not in developers scope.

d
d DATA / NETWORKING


Only Conduit / Shaft Provision given. Distribution / Cabling from rising d main in developers scope.

d
AHU, OFFICE EQUIPMENT’S & SMALL POWER DISTRIBUTION


Connected Load of 140KW per floor.

One Number Rising Main & One Redundant.

Two 125A Tap Off Boxes with Metering on each Rising Main for small d d Power Main & redundant supply.

 
DG FOR 100% BACK UP

100% Back Up including for Air Conditioning.

Capacity Envisaged : 7020 KVA

Transformer Capacity Approximately
GENERAL
PLUMBING / SANITARY
AIR CONDITIONING
FIRE FIGHTING
ELECTRICAL